Government  ·  United Arab Emirates

Fujairah Fine Arts Academy

Calligraphy and a piano, cut into award form

Fujairah Fine Arts Academy, Calligraphy and a piano, cut into award form
Piece
Awards
Materials
Crystal · Wood
Processes
Engraving
Produced
In-house, UAE
Market
United Arab Emirates

Designing Awards Around an Art Form

Across two distinct projects, Crystal Arc developed recognition pieces aligned with difference facets of the Academy’s mission and ceremonial needs. While the forms differed, both projects shared a common design approach, focused on balance, proportion, and cultural sensitivity, ensuring that each piece felth considered, intentional, and appropriate to its context.

All projects were designed and produced fully in-house at Crystal Arc, allowing complete control over materials, proportions, surface quality, and finishing.

Fujairah Fine Arts Academy, Designing Awards Around an Art Form

Calligraphy-Led Awards

One project centred on calligraphy-driven awards, using bold Arabic typography as the primary design element. Rather than treating text as an applied graphic, the calligraphy became the object itself.

Material contrast and controlled finishes were used to give the script visual weight and presence, allowing the piece to feel ceremonial without becoming ornate. The result was an award that celebrated cultural expression with confidence and clarity.

Fujairah Fine Arts Academy, Calligraphy-Led Awards

The Piano-Inspired Sculptural Award

The second project took a more sculptural direction, drawing inspiration from music and performance. Rather than replicating a piano literally, the piece was developed as an abstract interpretation, using flowing curves and layered forms to suggest rhythm, movement, and sound.

Warm-toned materials and wood textures were selected to reference the tactility and craftsmanship of classical instruments, while precision-cut details and refined edges ensured the piece remained contemporary and gallery-worthy. The structure was carefully engineered to feel grounded and substantial in hand, reinforcing its role as a serious artistic award.

Fujairah Fine Arts Academy, The Piano-Inspired Sculptural Award

Engraving and Hand-Finishing

Material choice, surface refinement, and proportion were treated with particular care across both projects. Each piece progressed through a controlled in-house process including fabrication, finishing, engraving, and custom presentation preparation.

Attention was given to how each award would be handled, viewed on stage, and displayed over time, ensuring long-term relevance rather than short-lived visual impact.

Fujairah Fine Arts Academy, Engraving and Hand-Finishing

An Award That Reads as Artwork

Together, these projects form a cohesive body of work that reflects Fujairah Fine Arts Academy’s commitment to artistic excellence and cultural integrity. The awards demonstrate Crystal Arc’s ability to translate creative disciplines, music, calligraphy, and visual art, into physical forms that feel thoughtful, respectful, and enduring.

Fujairah Fine Arts Academy, An Award That Reads as Artwork

Together, these projects form a cohesive body of work that reflects Fujairah Fine Arts Academy’s commitment to artistic excellence and cultural integrity.

Fujairah Fine Arts Academy  ·  United Arab Emirates

Common Questions

Who made the Fujairah Fine Arts Academy awards?

Crystal Arc. The piece was designed, manufactured and finished in-house at our own 200,000 sq ft facility in the UAE, then delivered to Fujairah Fine Arts Academy in the UAE.

What is the Fujairah Fine Arts Academy awards made from?

Crystal and Wood. Material selection was driven by the piece's ceremonial role rather than by ease of production.

How was the Fujairah Fine Arts Academy awards made?

Production ran entirely on our own benches and included and engraving, with internal quality checks at each stage and a final inspection before presentation.

Was any part of the work outsourced?

No. Design, manufacture, finishing and packaging were all completed at Crystal Arc's UAE facility. Nothing in this project was subcontracted.

Every piece described here was designed, manufactured and finished at our own 200,000 sq ft facility in the UAE, with nothing outsourced.

Start a Project

Tell us what the moment is.
We will tell you what it should be made of.

We respond within 2 hours.

No spam. No follow-up calls. Just a proposal.